CHRISTIANSBURG, VA

CONTRACTOR

CH2MHill Constructors, Inc.
Chantilly, TX

PROJECT SPECS

$90 Million, Widening 5 miles of Interstate 81

This project added a 12-foot continuous truck climbing lane to Southbound Interstate 81 on Christiansburg Mountain from milepost 120 to milepost 125 along with an upgrade to the median and outside shoulder. Three bridges were replaced as part of this project, two of which are secondary road bridges that cross over I-81.

EQUIPMENT USED:

TB130 Telebelt
31M Boom Pump